What should be clarified between a site cut and a slab?
Ask what area is being prepared, what drawings or levels exist, and who is responsible for the next stage. A site cut or building pad is not itself a finished slab. The order and handoff depend on the requirements of your project.
For an initial enquiry, describe the ground you have and the next work you are planning. A missing document is useful to flag early.

Guidance, not a specification



Two scopes can touch without being one job.
Earthmoving may be discussed alongside future concrete work, but a groundworks enquiry and a slab enquiry need their own agreed limits. Avoid treating the word “pad” as proof that a site is ready for concrete.
No universal handover detail.
This guide does not specify cut depths, compaction, drainage, engineering, testing or who is responsible for them. Those requirements and responsibilities belong to the project documents and the parties engaged for that job.
Describe the ground and the next step.
Put the available information in one place so the work being asked about is easier to distinguish.
Location & access
Property address, entry points and any known obstacles between entry and the proposed work area.
Footprint & levels
The proposed building position and any existing or proposed levels shown in your documents.
Existing work
What has already been excavated, filled or built, if anything; say when you are unsure.
Next contractor
What will follow the groundworks and any instructions or drawings already provided for that stage.
Questions for the handoff.
Get agreement on the boundaries rather than assuming one trade has covered the next.
- 01
What does “ready” mean in the supplied documents?
Point to the relevant drawings and identify who has set the requirements.
- 02
Who confirms the levels and any required checks?
Record the responsible party instead of assuming a pad description includes verification.
- 03
What happens to excavated material?
Ask what may remain, move or leave the property; this is a scope question, not a standard inclusion.
- 04
Who owns the next stage?
Make the transition to further preparation or concrete an explicit conversation.
Quick answers.
- Is a building pad the same as a finished slab?
- No. A pad is ground preparation; a slab is a separate piece of concrete work. Say which one you are asking about.
- Who sets the requirements for the ground?
- They normally come from your project documents and the designers or engineers on the job. Bring the drawings you have and ask who is responsible for each requirement.
- Can I ask about earthmoving and a slab together?
- Yes. Describe both stages and ask for the scope of each to be agreed against your plans.
- What happens to excavated material?
- It depends on the job and should be raised in your enquiry: say whether material needs to stay, move on site or leave the property.